industrial

transmountain access road network

In 2025, FIRMA constructed 10 km of permanent access roads across 32 valve sites along the TransMountain corridor. Crews removed temporary routes, installed long-term drainage and erosion controls, and completed full environmental reclamation — all while navigating saturated ground conditions, high-traffic access points, and strict environmental protocols.

The impact

Reliable long-term access for maintenance teams across 32 key valve sites, improving operational efficiency and safety.

 

Challenges overcome

Saturated ground, multi-highway traffic, and complex environmental requirements — resolved with phased planning and coordinated permitting.

 

Results

Permanent access roads and compliant drainage systems delivered on schedule, restoring the corridor for long-term operations.

 

reflection

This project reaffirmed how thoughtful access design strengthens both infrastructure performance and environmental stewardship.