FIRMA was contracted to form and place the concrete median slabs for the new Marigold LRT alignment along Valley Line West. Our crews executed full layout, forming, pouring, and finishing of long-run structural medians with strict elevation and slope tolerances required for trackway construction. This work forms the backbone of the dual-track guideway, ensuring long-term precision and durability as Edmonton expands its transit network.