industrial

PERMANENT PIPELINE ACCESS RAMP

In 2024, FIRMA constructed a permanent engineered access ramp to allow a landowner safe year-round travel across a multi-pipeline right-of-way. The work included grading a 600 m temporary access road, establishing controlled corridor access, and installing a 6 m × 35 m × 2 m permanent ramp capable of long-term service.

The impact

Safe, dependable property access for the landowner while respecting pipeline integrity and maintenance requirements.

Challenges overcome

Tight working conditions over active pipelines and late-season construction demands — managed through controlled grading and careful sequencing.

Results

A durable, compliant access ramp that improves land usability and maintains critical infrastructure safety.

reflection

This project highlighted how small but strategic access improvements can significantly enhance everyday landowner operations.