FIRMA delivered the civil and mechanical construction for the Meadows Force Main and Lift Station in Saskatoon, installing 4 km of 400mm HDPE pipe along with air-release and pump-drain structures, roadway casing crossings, and swab launch/disposal infrastructure.
The project also included a cast-in-place dry well, a precast wet well, and a complete pump house equipped with three large pumps and a backup generator, forming a critical component of the region’s wastewater system.