MEADOWS FORCE MAIN & LIFT STATION

FIRMA delivered the civil and mechanical construction for the Meadows Force Main and Lift Station in Saskatoon, installing 4 km of 400mm HDPE pipe along with air-release and pump-drain structures, roadway casing crossings, and swab launch/disposal infrastructure.

The project also included a cast-in-place dry well, a precast wet well, and a complete pump house equipped with three large pumps and a backup generator, forming a critical component of the region’s wastewater system.

The impact

Enhanced municipal wastewater capacity and reliability through upgraded force main infrastructure and a modernized lift station designed for long-term service.

Challenges overcome

Complex pipe installation across roadway crossings, integration of swab launch and disposal systems, and tight coordination required for cast-in-place and precast concrete structures housing major pumping equipment.

reflection

This project showcases FIRMA’s ability to deliver large-scale civil and mechanical infrastructure that strengthens community utilities and supports future population growth.