Contracting

Lake K Outfall Structure

Firma constructed a new stormwater outfall system featuring twin concrete culverts, a control vault and gate assemblies. The structure was designed to manage controlled flow from the upstream storm network into the receiving channel.

The impact

The upgraded outfall improved local drainage capacity and enhanced stormwater management for the surrounding area.

Challenges overcome

Working beside active drainage required careful water control, precise culvert placement and coordination within tight site boundaries.

reflection

This project demonstrated Firma’s capability in water-management structures, delivering a durable and reliable outfall integrated into the existing storm network.